{"id":5928,"date":"2019-08-05T12:52:21","date_gmt":"2019-08-05T07:22:21","guid":{"rendered":"https:\/\/carajput.com\/blog\/?p=5928"},"modified":"2023-02-22T00:22:32","modified_gmt":"2023-02-21T18:52:32","slug":"corporate-and-professional-updates-on-3rd-august-2019","status":"publish","type":"post","link":"https:\/\/carajput.com\/blog\/corporate-and-professional-updates-on-3rd-august-2019\/","title":{"rendered":"MCA launching Company Forms on MCA21 V3 portal"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_58 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<p class=\"ez-toc-title\">Page Contents<\/p>\n<label for=\"ez-toc-cssicon-toggle-item-69e1a8ea3166d\" class=\"ez-toc-cssicon-toggle-label\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #000000;color:#000000\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #000000;color:#000000\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/label><input type=\"checkbox\"  id=\"ez-toc-cssicon-toggle-item-69e1a8ea3166d\"  aria-label=\"Toggle\" \/><nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/carajput.com\/blog\/corporate-and-professional-updates-on-3rd-august-2019\/#MCA_launching_Company_Forms_on_MCA21_V3_portal\" title=\"MCA launching Company Forms on MCA21 V3 portal\">MCA launching Company Forms on MCA21 V3 portal<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/carajput.com\/blog\/corporate-and-professional-updates-on-3rd-august-2019\/#Key_points_about_MCA_V3_Portal\" title=\"Key points about MCA V3\u00a0 Portal \">Key points about MCA V3\u00a0 Portal <\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/carajput.com\/blog\/corporate-and-professional-updates-on-3rd-august-2019\/#Following_are_the_Key_features_of_MCA_V3_Portal\" title=\"Following are the Key features of MCA V3\u00a0Portal \">Following are the Key features of MCA V3\u00a0Portal <\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/carajput.com\/blog\/corporate-and-professional-updates-on-3rd-august-2019\/#Key_differences_between_MCA_V2_Portal_and_MCA_V3_Portal\" title=\"Key differences between MCA V2 Portal and MCA V3 Portal\u00a0\">Key differences between MCA V2 Portal and MCA V3 Portal\u00a0<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/carajput.com\/blog\/corporate-and-professional-updates-on-3rd-august-2019\/#MCA_update_%E2%80%93_timeline_extended_till_31032023\" title=\"MCA update &#8211; timeline extended till 31.03.2023\">MCA update &#8211; timeline extended till 31.03.2023<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n\r\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-23006\" src=\"https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/MCA-launching-Company-Forms-on-MCA21-V3-portal..png\" alt=\"MCA launching Company Forms on MCA21 V3 portal\" width=\"821\" height=\"380\" srcset=\"https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/MCA-launching-Company-Forms-on-MCA21-V3-portal..png 512w, https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/MCA-launching-Company-Forms-on-MCA21-V3-portal.-300x139.png 300w\" sizes=\"(max-width: 821px) 100vw, 821px\" \/><\/p>\r\n<h2><span class=\"ez-toc-section\" id=\"MCA_launching_Company_Forms_on_MCA21_V3_portal\"><\/span><span style=\"color: #000080;\"><strong>MCA launching Company Forms on MCA21 V3 portal<\/strong><\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n<p>In our continuous endeavour to serve you better, the MCA is launching first set of Company Forms on MCA21 V3 portal. These forms will be launched on 31st Aug 2022 at 12:00 AM.<\/p>\r\n<p>Following forms will be rolled-out in this phase: DIR3-KYC Web, DIR3-KYC Eform, DPT-3, DPT-4, CHG-1, CHG-4, CHG-6, CHG-8 &amp; CHG-9. To facilitate implementation of these forms in V3 MCA21 portal, stakeholders are advised to note the below mention points:<\/p>\r\n<p>(1).Company e-Filings on V2 portal will be disabled from 15th Aug 2022 12:00 AM for the above 9 forms. All stakeholders are advised to ensure that there are no SRNs in Resubmission status and SRN pending payment.<\/p>\r\n<p>(2).Offline payments for the above 9 forms in V2 using Pay later option would be stopped from 07th Aug 2022 12:00 AM. You are requested to make payments for these forms in V2 through online mode (Credit\/Debit Card and Net Banking).<\/p>\r\n<h3><span class=\"ez-toc-section\" id=\"Key_points_about_MCA_V3_Portal\"><\/span><span style=\"color: #000080;\"><strong>Key points about MCA V3\u00a0 Portal <\/strong><\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n<p>Ministry of Corporate Affairs is now working to Changing &amp; upgrade the existing Company &amp; LLP gateway\/website from Version 2 to Version 3. This is an Changed version of the V2 site that is only Existing available to companies with\u00a0Limited Liability Partnership\u00a0Registration in India.<\/p>\r\n<p>MCA V3\u00a0Portal has Existing the following for Limited Liability Partnership\u2019s<\/p>\r\n<ul>\r\n<li>Login &amp; user Registration<\/li>\r\n<li>DSC\u00a0Association<\/li>\r\n<li>MCA Form filing for\u00a0all the Limited Liability Partnership\u00a0Compliances<\/li>\r\n<\/ul>\r\n<p>MCA said services on Ministry of Corporate Affairs V3 portal were launched on 8th March 2022.<\/p>\r\n<h3><span class=\"ez-toc-section\" id=\"Following_are_the_Key_features_of_MCA_V3_Portal\"><\/span><span style=\"color: #000080;\"><strong>Following are the Key features of MCA V3\u00a0Portal <\/strong><\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n<ul>\r\n<li>New Payment Platforms<\/li>\r\n<li>Its Secure, Simplified Login &amp; Registrations<\/li>\r\n<li>Form Enhancements<\/li>\r\n<li>Revamped Back Office Portal for Officers.<\/li>\r\n<li>Limited Liability Partnership forms<\/li>\r\n<li>Interactive Dashboards<\/li>\r\n<\/ul>\r\n<p>One has to log in or sign up in the MCA portal at www.mca.gov.in in order to access both the V2 and V3 versions of the MCA Portal, where the user will be given access to LLP (V3) and Companies\/other files (V2) individually. Now, V2 and V3 are both functioning without a hitch.<\/p>\r\n<h3><span class=\"ez-toc-section\" id=\"Key_differences_between_MCA_V2_Portal_and_MCA_V3_Portal\"><\/span><span style=\"color: #000080;\"><strong>Key differences between MCA V2 Portal and MCA V3 Portal\u00a0<\/strong><\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-24077\" src=\"https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/Key-differences-between-MCA-V2-Portal-and-MCA-V3-Portal-.jpg\" alt=\"Differences between MCA V2 Portal and MCA V3 Portal\u00a0\" width=\"1200\" height=\"630\" srcset=\"https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/Key-differences-between-MCA-V2-Portal-and-MCA-V3-Portal-.jpg 1200w, https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/Key-differences-between-MCA-V2-Portal-and-MCA-V3-Portal--300x158.jpg 300w, https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/Key-differences-between-MCA-V2-Portal-and-MCA-V3-Portal--1024x538.jpg 1024w, https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/Key-differences-between-MCA-V2-Portal-and-MCA-V3-Portal--768x403.jpg 768w, https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/Key-differences-between-MCA-V2-Portal-and-MCA-V3-Portal--800x420.jpg 800w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\r\n<ul>\r\n<li>Version 2 forms require to be completed and uploaded to the portal, whereas Version 3 forms must be completed online. This makes it easier for users, who can save forms that are only partially completed and file it later. Furthermore, Version 2 only included a My Workspace, which had a list of notices from MCA and circulars that they had issued.<\/li>\r\n<li>A customizable &#8220;My Application&#8221; feature in Version 3 allows users to view all forms they have submitted to date and their current status, such as &#8220;Pending for DSC upload,&#8221; &#8220;Under Processing,&#8221; &#8220;Paying fees,&#8221; and &#8220;Resubmitting.&#8221; In contrast to V2, a user logs into V3 using their email address. With the user id, it was possible. An OTP will be issued to your email and mobile device when a business user logs into the MCA system to ensure the user&#8217;s identity.<\/li>\r\n<li>Finally, there is no major difference in Associating Digital signature certificate between V2 and V3.<\/li>\r\n<\/ul>\r\n<h3><span class=\"ez-toc-section\" id=\"MCA_update_%E2%80%93_timeline_extended_till_31032023\"><\/span><span style=\"color: #000080;\"><strong>MCA update &#8211; timeline extended till 31.03.2023<\/strong><\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n<ul>\r\n<li>Extension of Time for filing of 45 company e-Forms, PAS-03 and SPICE+PartA in MCA 21 Version 3.0 without additional fee -reg.<\/li>\r\n<li>further additional time till 31.03.2023 for filing of these forms which are due for filing between 07.02.2023 and 28.02.2023, without additional fees, to the stakeholders.<\/li>\r\n<\/ul>\r\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-24083\" src=\"https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/photo_2023-02-21_23-43-01.jpg\" alt=\"MCA V3\" width=\"847\" height=\"1782\" srcset=\"https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/photo_2023-02-21_23-43-01.jpg 540w, https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/photo_2023-02-21_23-43-01-143x300.jpg 143w, https:\/\/carajput.com\/blog\/wp-content\/uploads\/2019\/08\/photo_2023-02-21_23-43-01-487x1024.jpg 487w\" sizes=\"(max-width: 847px) 100vw, 847px\" \/><\/p>\r\n<p><span style=\"color: #000080;\"><strong>Popular Articles:<\/strong><\/span><\/p>\r\n<ul>\r\n<li><a href=\"https:\/\/carajput.com\/blog\/new-online-filing-eform-dir-3-ekyc-directors-for-fy-2019-20\/\"><span style=\"color: #000080;\"><strong>New Online filing eForm DIR-3 eKYC Directors<\/strong><\/span><\/a><\/li>\r\n<li><strong><span style=\"color: #000080;\"><a style=\"color: #000080;\" href=\"https:\/\/carajput.com\/blog\/closure-of-subsidiary-company\/\">CLOSURE OF SUBSIDIARY COMPANY<\/a><\/span><\/strong><\/li>\r\n<li><strong><span style=\"color: #000080;\"><a style=\"color: #000080;\" href=\"https:\/\/carajput.com\/blog\/compliance-for-foreign-subsidiary-companies-in-india\/\">Compliance for Foreign Subsidiary Companies in India<\/a><\/span><\/strong><\/li>\r\n<li><strong><span style=\"color: #000080;\"><a style=\"color: #000080;\" href=\"https:\/\/www.caindelhiindia.com\/blog\/company-registration-of-online-sellers\/\">Company Registration of online sellers<\/a><\/span><\/strong><\/li>\r\n<li><span style=\"color: #000080;\"><a style=\"color: #000080;\" href=\"https:\/\/carajput.com\/blog\/mca-business-user-registration\/\"><strong>MCA Business User Registration at ministry of Corporate Affairs<\/strong><\/a><\/span><\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>MCA launching Company Forms on MCA21 V3 portal In our continuous endeavour to serve you better, the MCA is launching first set of Company Forms on MCA21 V3 portal. These forms will be launched on 31st Aug 2022 at 12:00 AM. Following forms will be rolled-out in this phase: DIR3-KYC Web, DIR3-KYC Eform, DPT-3, DPT-4, &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10008],"tags":[5238],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/carajput.com\/blog\/wp-json\/wp\/v2\/posts\/5928"}],"collection":[{"href":"https:\/\/carajput.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/carajput.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/carajput.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/carajput.com\/blog\/wp-json\/wp\/v2\/comments?post=5928"}],"version-history":[{"count":6,"href":"https:\/\/carajput.com\/blog\/wp-json\/wp\/v2\/posts\/5928\/revisions"}],"predecessor-version":[{"id":26260,"href":"https:\/\/carajput.com\/blog\/wp-json\/wp\/v2\/posts\/5928\/revisions\/26260"}],"wp:attachment":[{"href":"https:\/\/carajput.com\/blog\/wp-json\/wp\/v2\/media?parent=5928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/carajput.com\/blog\/wp-json\/wp\/v2\/categories?post=5928"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/carajput.com\/blog\/wp-json\/wp\/v2\/tags?post=5928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}